The Lagos State government has taken decisive steps to enforce drainage setbacks and reclaim critical water channels by issuing a seven-day contravention notice to property owners along Orchid Road, Agungi, Ajiran, and Conservation Road in the Lekki area.
Commissioner for the Environment and Water Resources, Mr. Tokunbo Wahab, accompanied by Special Adviser, Environment, Mr. Olakunle Rotimi-Akodu, delivered the notice following an extensive inspection tour. The affected buildings, situated within the approved seven-meter setback, have been given a grace period for voluntary compliance.
Wahab emphasized the paramount importance of respecting the state’s drainage masterplan to prevent property demolitions. The government remains resolute in enforcing the law, and the decision to issue notices was prompted by complaints from the Nigerian Conservation Foundation (NCF) regarding distortions impacting natural habitats and drainage channels.
Acknowledging the humane approach taken by the state, Wahab disclosed that the setback alignment had been revised from seven to six meters following discussions with property owners. This adjustment aims to minimize the number of structures affected by the enforcement.
The commissioner urged Lagosians to adhere to the stipulated setback regulations within the next seven days to avoid enforcement actions, emphasizing the government’s commitment to curbing flooding caused by unauthorized constructions. He noted that without law and order, there cannot be sustainable development.
During the inspection tour, Wahab and his team visited Oral Estate II along System 156 Igbo Efon, where illegal structures had completely blocked the Primary Channel without proper drainage approvals. The team also assessed Agungi, Ajiran, and Osapa, where previous notices had been served. Final decisions on these areas will be made based on the observed level of encroachment regarding the setbacks of primary channels and secondary collectors.
Wahab highlighted that the original size of the System 156 Ikota River channel was 46 meters, but property owners and residents had encroached upon it. Those found in violation of the law, with properties falling within the original meters of the channel setback on both sides, have been given the next seven days to rectify the situation. Enforcement actions will commence immediately after the expiration of the notices.
As part of the tour, the commissioner issued a stop-work order to Gravitas company at Chevron Drive. This action was taken due to unauthorized sand-filling that reduced the size of the Ikota River lagoon from its original 250 meters designed to accommodate free water flow. The government remains steadfast in its commitment to preserving vital water channels and enforcing environmental regulations for the greater well-being of the community.


